Construction of a Diesel tank of 6600m3 and a “pipe-line” for fueling the Total Fuel deposit Ekuku, Bata Client: Total Equatorial Guinea Location: Bata, Equatorial Guinea Year: 2012 Keywords: Environment, International, Pipe-Line, Deposits, Diesel.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed