Our Work

Construction of a bridge over the Rusizi river, border between Burundi and the Democratic Republic of Congo (RN 4 PK 15 457)

Study for the Rehabilitation, improvement of the lay out and lateral slope protection of the Road “Estrada Nacional nº1”, PK0+000 – PK27 +000

Construction of Secondary Irrigation and Drainage Networks Network Block IV Hydroagricultural Lezíria Harnessing Grande Vila Franca de Xira
