Tranports

Rehabilitation works of the RN2 and RN3 (Section Mtsangadjou – Mohoro – Foumbouni – Ouroveni – 26 km)

Rehabilitation works of the RN2 and RN3 (Section Mtsangadjou – Mohoro – Foumbouni – Ouroveni – 26 km)

Adequacy of structures for electrification, technical buildings and elevation of quays on the Douro Line

Adequacy of structures for electrification, technical buildings and elevation of quays on the Douro Line

Rehabilitation works of the RN4 cross-border axis between Burundi and the DRC border

Rehabilitation works of the RN4 cross-border axis between Burundi and the DRC border

Construction of a bridge over the Rusizi river, border between Burundi and the Democratic Republic of Congo (RN 4 PK 15 457).

Construction of a bridge over the Rusizi river, border between Burundi and the Democratic Republic of Congo (RN 4 PK 15 457).

Rehabilitation of Rural Roads off RN 15, and Urban Roads in the towns of Gitega & Ngozi

Rehabilitation of Rural Roads off RN 15, and Urban Roads in the towns of Gitega & Ngozi

Study for the Rehabilitation, improvement of the lay out and  lateral slope protection of the Road “Estrada Nacional nº1”, PK0+000 – PK27 +000

Study for the Rehabilitation, improvement of the lay out and lateral slope protection of the Road “Estrada Nacional nº1”, PK0+000 – PK27 +000

Modernisation of the Railway “Linha do Oeste” at the Section Mira Sintra/Meleças – Caldas da Rainha between KM 20+230 and 107+740

Modernisation of the Railway “Linha do Oeste” at the Section Mira Sintra/Meleças – Caldas da Rainha between KM 20+230 and 107+740