Prospectiva
  • English
    • Français
    • Português
    • Español
  • About us
  • Services
  • Projects
  • International
  • Contacts
Select Page
Roads
  • All
  • Buildings
    • Sport
    • Education
    • Housing
    • Hospitality
    • Industry
    • Public
    • Health
    • Services
  • Hydraulics and Environment
    • Water supply
    • Dams
    • Registration and IGC
    • Agricultural hydraulics
    • River Hydraulics
    • USW
    • Sanitation
  • Transportation
    • Airports
    • Ports
    • Roads
    • Railways
  • Urban planning
    • Electrification
    • Infrastructures
    • Urban planning
  • Location
    • Angola
    • Algeria
    • Brazil
    • Burundi
    • Cape Verde
    • Equatorial Guinea
    • Malawi
    • Morocco
    • Mozambique
    • São Tomé and Príncipe
    • Tanzania
Rehabilitation of Rural Roads off RN 15, and Urban Roads in the towns of Gitega & Ngozi

Rehabilitation of Rural Roads off RN 15, and Urban Roads in the towns of Gitega & Ngozi

Design and Supervision for the Construction of the Toll Station on the RN1

Design and Supervision for the Construction of the Toll Station on the RN1

Complementary Studies of the RN3 Project: Rumonge – Gitaca

Complementary Studies of the RN3 Project: Rumonge – Gitaca

Rehabilitation works of the RN4 cross-border axis between Burundi and the DRC border

Rehabilitation works of the RN4 cross-border axis between Burundi and the DRC border

Rehabilitation and Construction of Access Roads to Bujumbura Port (12 km)

Rehabilitation and Construction of Access Roads to Bujumbura Port (12 km)

Bujumbura’s northern bypass Express Road (+/- 24,8Km).

Bujumbura’s northern bypass Express Road (+/- 24,8Km).

Construction of a bridge over the Rusizi river, border between Burundi and the Democratic Republic of Congo (RN 4 PK 15 457).

Construction of a bridge over the Rusizi river, border between Burundi and the Democratic Republic of Congo (RN 4 PK 15 457).

Toll Stations / Weighing the Benin Road Network

Toll Stations / Weighing the Benin Road Network

Bissau Radar Coast Station

Bissau Radar Coast Station

Rehabilitation Works of the EN 1 Roads – Agostinho Neto – Caldeiras, Gaspar – Sundy

Rehabilitation Works of the EN 1 Roads – Agostinho Neto – Caldeiras, Gaspar – Sundy

Study for the Rehabilitation, improvement of the lay out and  lateral slope protection of the Road “Estrada Nacional nº1”, PK0+000 – PK27 +000

Study for the Rehabilitation, improvement of the lay out and lateral slope protection of the Road “Estrada Nacional nº1”, PK0+000 – PK27 +000

Rehabilitation of Makebuko-Ruyigi Road (RN13) and connected works.

Rehabilitation of Makebuko-Ruyigi Road (RN13) and connected works.

Regional Road ER125 – Vila Nova de Cacela / connexion to the A22, including roundabouts at Km 146+500 and Km 148 + 600 – Rehabilitation.

Marão Tunnel- IP4 (A4).

Marão Tunnel- IP4 (A4).

National Road EN229 – Rehabilitation between Vilarouco (km 0+000) and Penedono (km15 + 480).

National Road EN117 – Rehabilitation.

National Road EN117 – Rehabilitation.

Página 1 de 3123»
  • Company
  • Services
  • Projects
  • Internacional
  • Contacts
  • Privacy Policy
  • Follow
  • Follow
  • Follow

Copyright © 2015 – 2022  Prospectiva | Proudly handcrafted by codefive

  • French
  • Portuguese (Portugal)
  • Spanish